3 sonucu aktar:
Yazar Başlık [ Tür(Desc)] Yıl
Süzgeçler: Yazar: Beşikci, Umut  [Clear All Filters]
Journal Article
Beşikci, U., Ü. Bilge, and G. Ulusoy, Different resource management policies in multi-mode resource constrained multi-project scheduling, : Institute of Electrical and Electronics Engineers, Inc., 2011.
Bilge, Ü., E. Albey, U. Beşikci, K. Erbatur, and A. Nur Aslan, "Mathematical models for FMS loading and part type selection with flexible process plans", European Journal of Industrial Engineering: Inderscience, 2013.
Beşikci, U., Ü. Bilge, and G. Ulusoy, "Resource dedication problem in a multi-project environment", Flexible Services and Manufacturing Journal, vol. 25, no. 1-2: Springer, pp. 206–229, 2013.