18 sonucu aktar:
Yazar [ Başlık(Asc)] Tür Yıl
Süzgeçler: Yazar: Ümit Bilge  [Clear All Filters]
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 
T
Bilge, Ü., and G. Ulusoy, "A time window approach to simultaneous scheduling of machines and material handling system in an FMS", Operations Research, vol. 43, no. 6: INFORMS, pp. 1058–1070, 1995.
Bilge, Ü., M. Kurtulan, and F. Kıraç, "A tabu search algorithm for the single machine total weighted tardiness problem", European Journal of Operational Research, vol. 176, no. 3: Elsevier, pp. 1423–1435, 2007.
Bilge, Ü., F. Kıraç, M. Kurtulan, and P. Pekgün, "A tabu search algorithm for parallel machine total tardiness problem", Computers & Operations Research, vol. 31, no. 3: Elsevier, pp. 397–414, 2004.
S
Ulusoy, G., and Ü. Bilge, "Simultaneous scheduling of machines and automated guided vehicles", THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, vol. 31, no. 12: Taylor & Francis, pp. 2857–2873, 1993.
R
Aras, N., and Ü. Bilge, "Robust supply chain network design with multi-products for a company in the food sector", Applied Mathematical Modelling, vol. 60, pp. 526-539, 2018.
Beşikci, U., Ü. Bilge, and G. Ulusoy, "Resource dedication problem in a multi-project environment", Flexible Services and Manufacturing Journal, vol. 25, no. 1-2: Springer, pp. 206–229, 2013.
O
Başdere, M., and Ü. Bilge, "Operational aircraft maintenance routing problem with remaining time consideration", European Journal of Operational Research, vol. 235, no. 1: Elsevier, pp. 315–328, 2014.
M
Albey, E., Ü. Bilge, and R. Uzsoy, "Multi-dimensional clearing functions for aggregate capacity modelling in multi-stage production systems", International Journal of Production Research, vol. 55, pp. 4164–4179, 2017.
Bilge, Ü., G. Esenduran, N. Varol, Z. Öztürk, B. Aydın, and A. Alp, "Multi-attribute responsive dispatching strategies for automated guided vehicles", International Journal of Production Economics, vol. 100, no. 1: Elsevier, pp. 65–75, 2006.
Bilge, Ü., E. Albey, U. Beşikci, K. Erbatur, and A. Nur Aslan, "Mathematical models for FMS loading and part type selection with flexible process plans", European Journal of Industrial Engineering: Inderscience, 2013.
Koşucuoğlu, D., and Ü. Bilge, "Material handling considerations in the FMS loading problem with full routing flexibility", International Journal of Production Research, vol. 50, no. 22: Taylor & Francis, pp. 6530–6552, 2012.
H
Albey, E., and Ü. Bilge, "A hierarchical approach to FMS planning and control with simulation-based capacity anticipation", International Journal of Production Research, vol. 49, no. 11: Taylor & Francis, pp. 3319–3342, 2011.
E
Albey, E., Ü. Bilge, and R. Uzsoy, "An exploratory study of disaggregated clearing functions for production systems with multiple products", International Journal of Production Research, no. ahead-of-print: Taylor & Francis, pp. 1–22, 2014.
A
Bilge, Ü., and JMA. Tanchoco, "AGV systems with multi-load carriers: basic issues and potential benefits", Journal of manufacturing systems, vol. 16, no. 3: Elsevier, pp. 159–174, 1997.